An internal approval portal project might start with a prototype for departments to test. A transaction tracking system overhaul project might require finalizing test criteria before writing code. Both require analysis, development, and testing, but the order of execution and the timing of feedback will differ.
This article compares seven software development models based on their ability to adapt to change, speed of first version, level of customer involvement, and implementation difficulty. This allows businesses to choose the organizational model that best suits the requirements, resources, and risks of each project.
Quick summary
|
A software development model is a way of organizing activities within the software development lifecycle (SDLC). The model defines the sequence of stages—from planning, requirements analysis, design, programming, testing, to deployment and maintenance—which activities are repeated, and when user feedback is involved. A software development process describes the work, responsibilities, and expected outputs at each step. The model guides how those tasks are arranged. Scrum is a framework that teams can use to implement Agile principles.
Choosing a model during the planning phase helps businesses determine when requirements are finalized, allocate resources, and agree on acceptance methods. For example, if the primary risk is building an incorrect approval flow, the project team can provide a sample for user review early. If the risk lies in data discrepancies during integration, the team should prioritize verifying the data flow and reconciliation criteria.
>>> Read more: What is SDLC? 7 stages and how to shorten the software development lifecycle
The table below compares seven models under typical conditions. Speed and difficulty are relative, as they depend on the scope of integration, team experience, and user involvement. With RAD, the first version is usually a prototype used to validate requirements. With Incremental, it could be a set of functionalities already ready for operation.
Model | approach | Flexibility when changing requirements | Initial speed | Customer involvement | Level of deployment | The project is suitable. |
|---|---|---|---|---|---|---|
Waterfall | Sequential | Short | Slow | According to the milestone | Easy | Clear and consistent requirements |
Agile | Repeat in short cycles | High | Fast | Frequent | Medium | The product is constantly changing. |
RAD | Create and test prototypes. | High | Very fast with templates | Very often | Medium - Hard | Business applications need to be launched quickly. |
V-Model | Sequence linked to testing | Short | Slow | According to the test benchmark | Medium | The system requires rigorous testing. |
Alternative | Improvement through multiple stages | High | Fast | In a loop | Medium | The request is incomplete. |
Spiral | Iteration and risk management | High | Depending on risk | According to the evaluation round | Difficult | Large project, high risk. |
Incremental | Handover in stages. | Medium - high | If the functions can be separated soon. | According to the handover schedule | Medium | The system can be divided into modules. |
Waterfall projects are organized into sequential phases , from requirements analysis, design, development, testing to deployment and maintenance. Each phase typically has outputs that require approval before moving on. If changes arise after the design has been finalized, the project team must assess the impact on documentation, timelines, and test scope.
Advantage:
The approval milestones, responsibilities, and handover documentation are clearly defined. Once the requirements are settled, the project team has a basis for estimating the budget and planning for acceptance.
Limit:
Users often find that software is working relatively late. If the team misunderstands a business rule from the start, that change can lead to revisions to the design, code, and test scripts.
Suitable for:
The projects had clear specifications, minimal variability, and required milestone-based acceptance testing. For example, building a data conversion tool between two systems with agreed-upon input, output, and reconciliation rules.
Agile is an approach based on principles such as regular software delivery , close collaboration with business units, and prioritization adjustments as new information emerges. Project teams can use Scrum for sprint work, apply Kanban to manage workflows, or utilize the technical practices of Extreme Programming (XP).
Advantage:
The team can hand over priority functionalities early and use feedback to refine subsequent parts. Short handover periods also help detect quality issues or deviations from expectations early on.
Limit:
When the scope is constantly changing, forecasting timelines and total costs becomes more difficult. The project needs people with priority-making authority, users willing to provide feedback, and a team capable of testing across multiple releases.
Suitable for:
Digital products need to be validated with users, such as a scheduling app where the product team wants to test the booking, cancellation, and rescheduling workflow before finalizing additional features.
Rapid Application Development (RAD) focuses on creating prototypes quickly, allowing users to test and refine them through feedback. Prototypes help users validate details that are difficult to describe in documentation, such as who a request goes through, what data needs to be displayed during browsing, and how the system handles exceptions.
According to IBM's description , the RAD process typically consists of four stages.
Advantage:
Users get to test the workflow early. The team can fix any inconsistencies before investing heavily in integration or programming additional functionalities.
Limit:
RAD depends on user responsiveness and the development team's prototyping speed. For systems with many integrations or complex technical requirements, architecture validation and scope validation are necessary before scaling.
Suitable for:
Business applications can be broken down into smaller parts, requiring early beta testing and consistent user engagement. For example, the development team might test the purchase order flow in one department before adding approval levels and connecting to the accounting system.
>>> Read more: What is the RAD model? Why is rapid application development becoming a trend in enterprise software?
The V-Model links each design level to a corresponding testing level. Business requirements form the basis for acceptance testing. System specifications form the basis for system testing. Designing components and interfaces helps define the content of integration and unit testing. The team can prepare test criteria in parallel with analysis and design.
Advantage:
It's easy to trace from requirements to test results. During acceptance testing, businesses can check at what level each critical requirement has been verified.
Limit:
A business change can affect multiple documents, designs, and test cases. A fully operational version typically emerges after all components have been integrated.
Suitable for:
The system requires relative stability and needs to store proof of testing; for example, transaction reconciliation software must demonstrate that each calculation rule has been tested.
The iterative begins with a version sufficient to validate several key requirements. After each round, the team evaluates the results and refines the next version. For example, with the production planning screen, the team can progressively refine how machine capacity is displayed, adjust schedules, and handle urgent orders within the same function.
Advantage:
The project team can quickly identify inconsistencies and use the feedback to choose areas for improvement.
Limit:
Repeated revisions can make the architecture difficult to maintain if the team lacks evaluation criteria for each round or constantly delays addressing technical issues.
Suitable for:
When the goal is clear but there are many options for implementation, for example, trying different ways to present information before finalizing the control panel screen.
Spiral organizes projects using risk-based iterative processes. In each cycle, the team defines objectives, analyzes risks, develops or tests solutions, and evaluates the results to decide on the next step. A report by the Software Engineering Institute at Carnegie Mellon University describes risk management and mitigation as core features of the model.
Advantage:
Businesses can verify technical or operational assumptions before committing to the next investment phase.
Limit:
A team with risk analysis skills and time for testing and evaluation are needed. Management costs can be high compared to the benefits in a simple project.
Suitable for:
Complex systems, incorporating new technologies, or those with significant technical risks. For example, when merging data from multiple legacy systems, the first round might attempt to transform a representative dataset and measure deviations before scaling up.
Incremental divides the product into functional parts that are delivered in order of priority. Each part needs to have usability within a defined scope and be able to connect with the deployed parts. For example, a materials management system might release the inbound, outbound, and inventory functions first, then add purchasing planning and accounts receivable reconciliation.
Advantage:
Businesses can quickly identify and utilize essential functional groups and allocate budget, training, and transition in stages.
Limit:
Deployment costs depend on the architecture and shared data. If each subsystem defines its own product codes or synchronization rules, integration costs will increase with scale.
Suitable for:
The system has clearly defined functional boundaries and can be operated in parts. Within the same project, Iterative can be applied to improve a single function, while Incremental dictates the order in which functional groups are delivered.
Let's start with four questions. Which requirements are stable and which still need testing? Who can provide feedback and decide on priorities? Which functionality needs to be available soon to create value? What risks need to be addressed first, such as data discrepancies, operational disruptions, integration difficulties, or lack of test evidence? Then, consider the budget, deadlines, and team experience.
Note that a project can combine multiple approaches. For example, a business might use RAD to finalize the approval flow with the purchasing department, develop using Agile cycles, and then deliver functional groups sequentially. For sensitive business processes, the business might add requirements for traceability and acceptance testing in stages.
For example, consider a project with 10 functionalities, 6 of which have clearly defined rules and 4 that still require user testing. The project team can build prototypes using RAD for the 4 undefined functionalities, while using the Waterfall or V-Model approach for the 6 already defined functionalities.
A prototype helps the client and the development team agree on the earliest possible value proposition. For an outsourcing company (ITO), a prototype test can help clarify the scope and delivery criteria before estimating the effort required for the rest of the project.
The process described in the documentation often outlines common scenarios. During hands-on testing, users may encounter exceptions such as approving documents in the absence of a manager, changing approval levels based on transaction value, or returning documents for further information. Clarifying these situations early helps limit the need for multiple simultaneous functional modifications during the implementation phase. In practice, exceptions like approving documents only become apparent when users process a sample set of documents from start to finish, rarely appearing during process description meetings.
A low-code platform allows teams to build forms, data models, and processes from pre-existing components. Developers can then dedicate more time to specific logic such as limits, permissions, reconciliation, and integration. When transitioning the prototype to a working application, the team still needs to test data, permissions, performance, and exception handling.
1C:Enterprise is a low-code technology platform that combines programming with 1C Script to build and customize enterprise management applications. On this platform, development teams can build applications for sales management, production, inventory, finance and accounting, or industry-specific processes. According to the Vietnam Internet Association, more than 1.5 million businesses worldwide use solutions built on this platform.
>>> Read more: 1C:Enterprise - a technology platform that helps build specialized software for businesses
The project team can use a prototype to validate requirements before finalizing the scope, then retain the appropriate components for the operational version. For an ITO company with many clients in the same industry, shared functionalities such as catalogs, approval flows, and reports can be standardized for reuse . Client-specific elements are handled according to their own data, policies, and processes, paving the way for industry-specific solution packaging. Businesses can start with a business flow, such as a purchase request, and then evaluate prototyping time, business responsiveness, and integration effort before expanding to other modules.
LEARN MORE ABOUT THE 1C:ENTERPRISE PLATFORM HERE.
Choose a software development model based on what the project needs to control first. Waterfall is suitable when scope is stable, V-Model when test proofs are needed, and Spiral when technical risks determine the next investment step. Agile and Iterative are suitable when learning from feedback is needed, Incremental when functional team delivery is possible, and RAD when rapid business process validation using prototypes is required.
If the project has multiple user groups and requirements are constantly changing, choose a process with clear value proposition to test first. The results from this test will help the project team finalize the scope, testing methods, and the order in which to deploy subsequent parts.
Source: