Home Products news Top 7 most popular software development models today.
Phạm Viết Quý - Chuyên gia đào tạo nền tảng tại 1C Việt Nam
(26.11.2026)

Top 7 most popular software development models today.

An internal approval portal project might start with a prototype for departments to test. A transaction tracking system overhaul project might require finalizing test criteria before writing code. Both require analysis, development, and testing, but the order of execution and the timing of feedback will differ.

This article compares seven software development models based on their ability to adapt to change, speed of first version, level of customer involvement, and implementation difficulty. This allows businesses to choose the organizational model that best suits the requirements, resources, and risks of each project.

Quick summary

  • For stability requirements, approval milestones, or test proofs: consider Waterfall or V-Model.
  • Requirements are subject to change, and feedback needs to be considered: Agile or Iterative approaches should be taken into account. Handover needs to be done in functional groups: Incremental approaches should be considered.
  • Significant technical risk, requires testing before further investment: consider Spiral.
  • Need to quickly validate business processes using prototypes: consider RAD.
  • With RAD, businesses can use low-code platforms like 1C:Enterprise to prototype and develop enterprise management applications.

1. What is a software development model?

A software development model is a way of organizing activities within the software development lifecycle (SDLC). The model defines the sequence of stages—from planning, requirements analysis, design, programming, testing, to deployment and maintenance—which activities are repeated, and when user feedback is involved. A software development process describes the work, responsibilities, and expected outputs at each step. The model guides how those tasks are arranged. Scrum is a framework that teams can use to implement Agile principles.

Choosing a model during the planning phase helps businesses determine when requirements are finalized, allocate resources, and agree on acceptance methods. For example, if the primary risk is building an incorrect approval flow, the project team can provide a sample for user review early. If the risk lies in data discrepancies during integration, the team should prioritize verifying the data flow and reconciliation criteria.

>>> Read more: What is SDLC? 7 stages and how to shorten the software development lifecycle

2. Top 7 most popular software development models today

The table below compares seven models under typical conditions. Speed and difficulty are relative, as they depend on the scope of integration, team experience, and user involvement. With RAD, the first version is usually a prototype used to validate requirements. With Incremental, it could be a set of functionalities already ready for operation.

Model
approach
Flexibility when changing requirements
Initial speed
Customer involvement
Level of deployment
The project is suitable.
Waterfall
Sequential
Short
Slow
According to the milestone
Easy
Clear and consistent requirements
Agile
Repeat in short cycles
High
Fast
Frequent
Medium
The product is constantly changing.
RAD
Create and test prototypes.
High
Very fast with templates
Very often
Medium - Hard
Business applications need to be launched quickly.
V-Model
Sequence linked to testing
Short
Slow
According to the test benchmark
Medium
The system requires rigorous testing.
Alternative
Improvement through multiple stages
High
Fast
In a loop
Medium
The request is incomplete.
Spiral
Iteration and risk management
High
Depending on risk
According to the evaluation round
Difficult
Large project, high risk.
Incremental
Handover in stages.
Medium - high
If the functions can be separated soon.
According to the handover schedule
Medium
The system can be divided into modules.

2.1. Waterfall Model

Waterfall projects are organized into sequential phases , from requirements analysis, design, development, testing to deployment and maintenance. Each phase typically has outputs that require approval before moving on. If changes arise after the design has been finalized, the project team must assess the impact on documentation, timelines, and test scope.

Advantage:

The approval milestones, responsibilities, and handover documentation are clearly defined. Once the requirements are settled, the project team has a basis for estimating the budget and planning for acceptance.

Limit:

Users often find that software is working relatively late. If the team misunderstands a business rule from the start, that change can lead to revisions to the design, code, and test scripts.

Suitable for:

The projects had clear specifications, minimal variability, and required milestone-based acceptance testing. For example, building a data conversion tool between two systems with agreed-upon input, output, and reconciliation rules.

2.2. Agile Model - Agile Software Development

Agile is an approach based on principles such as regular software delivery , close collaboration with business units, and prioritization adjustments as new information emerges. Project teams can use Scrum for sprint work, apply Kanban to manage workflows, or utilize the technical practices of Extreme Programming (XP).

Advantage:

The team can hand over priority functionalities early and use feedback to refine subsequent parts. Short handover periods also help detect quality issues or deviations from expectations early on.

Limit:

When the scope is constantly changing, forecasting timelines and total costs becomes more difficult. The project needs people with priority-making authority, users willing to provide feedback, and a team capable of testing across multiple releases.

Suitable for:

Digital products need to be validated with users, such as a scheduling app where the product team wants to test the booking, cancellation, and rescheduling workflow before finalizing additional features.

2.3. The RAD Model - Rapid Application Development

Rapid Application Development (RAD) focuses on creating prototypes quickly, allowing users to test and refine them through feedback. Prototypes help users validate details that are difficult to describe in documentation, such as who a request goes through, what data needs to be displayed during browsing, and how the system handles exceptions.

According to IBM's description , the RAD process typically consists of four stages.

  • Finalize the project's goals, target audience, priority scope, and constraints.
  • Design with users, build prototypes, and gather feedback through business scenarios.
  • Develop the application, reuse suitable components, and continue to refine it with each version.
  • Testing, data conversion, user training, and deploying the application.

Advantage:

Users get to test the workflow early. The team can fix any inconsistencies before investing heavily in integration or programming additional functionalities.

Limit:

RAD depends on user responsiveness and the development team's prototyping speed. For systems with many integrations or complex technical requirements, architecture validation and scope validation are necessary before scaling.

Suitable for:

Business applications can be broken down into smaller parts, requiring early beta testing and consistent user engagement. For example, the development team might test the purchase order flow in one department before adding approval levels and connecting to the accounting system.

>>> Read more: What is the RAD model? Why is rapid application development becoming a trend in enterprise software?

2.4. The V-Model

The V-Model links each design level to a corresponding testing level. Business requirements form the basis for acceptance testing. System specifications form the basis for system testing. Designing components and interfaces helps define the content of integration and unit testing. The team can prepare test criteria in parallel with analysis and design.

Advantage:

It's easy to trace from requirements to test results. During acceptance testing, businesses can check at what level each critical requirement has been verified.

Limit:

A business change can affect multiple documents, designs, and test cases. A fully operational version typically emerges after all components have been integrated.

Suitable for:

The system requires relative stability and needs to store proof of testing; for example, transaction reconciliation software must demonstrate that each calculation rule has been tested.

2.5. Iterative Model

The iterative begins with a version sufficient to validate several key requirements. After each round, the team evaluates the results and refines the next version. For example, with the production planning screen, the team can progressively refine how machine capacity is displayed, adjust schedules, and handle urgent orders within the same function.

Advantage:

The project team can quickly identify inconsistencies and use the feedback to choose areas for improvement.

Limit:

Repeated revisions can make the architecture difficult to maintain if the team lacks evaluation criteria for each round or constantly delays addressing technical issues.

Suitable for:

When the goal is clear but there are many options for implementation, for example, trying different ways to present information before finalizing the control panel screen.

2.6. Spiral Model

Spiral organizes projects using risk-based iterative processes. In each cycle, the team defines objectives, analyzes risks, develops or tests solutions, and evaluates the results to decide on the next step. A report by the Software Engineering Institute at Carnegie Mellon University describes risk management and mitigation as core features of the model.

Advantage:

Businesses can verify technical or operational assumptions before committing to the next investment phase.

Limit:

A team with risk analysis skills and time for testing and evaluation are needed. Management costs can be high compared to the benefits in a simple project.

Suitable for:

Complex systems, incorporating new technologies, or those with significant technical risks. For example, when merging data from multiple legacy systems, the first round might attempt to transform a representative dataset and measure deviations before scaling up.

2.7. Incremental Model

Incremental divides the product into functional parts that are delivered in order of priority. Each part needs to have usability within a defined scope and be able to connect with the deployed parts. For example, a materials management system might release the inbound, outbound, and inventory functions first, then add purchasing planning and accounts receivable reconciliation.

Advantage:

Businesses can quickly identify and utilize essential functional groups and allocate budget, training, and transition in stages.

Limit:

Deployment costs depend on the architecture and shared data. If each subsystem defines its own product codes or synchronization rules, integration costs will increase with scale.

Suitable for:

The system has clearly defined functional boundaries and can be operated in parts. Within the same project, Iterative can be applied to improve a single function, while Incremental dictates the order in which functional groups are delivered.

3. Which software development model should businesses choose?

Let's start with four questions. Which requirements are stable and which still need testing? Who can provide feedback and decide on priorities? Which functionality needs to be available soon to create value? What risks need to be addressed first, such as data discrepancies, operational disruptions, integration difficulties, or lack of test evidence? Then, consider the budget, deadlines, and team experience.

  • If requirements are already established: Choose Waterfall if you need to manage according to clear approval milestones. Consider V-Model if the project still requires tight traceability from requirements to test results.
  • If requirements change frequently: Choose Agile if the project team can periodically discuss and adjust priorities. Use iterative methods when improvements to the same functionality need to be made across multiple cycles. For example, Spotify Engineering describes how their squads are fully responsible for each feature, from development to operations. This is an example of organizing cross-functional teams to shorten the feedback loop.
  • If you need to quickly validate a business process: Choose RAD when users can test samples and provide feedback frequently.
  • If technical risks could alter investment decisions: Choose Spiral if test results are needed to decide whether to expand to the next phase or adjust the design.
  • If handover is required in functional groups: Select Incremental if each group can operate within its own scope and share the agreed-upon data, access rights, and integrated interfaces.

Note that a project can combine multiple approaches. For example, a business might use RAD to finalize the approval flow with the purchasing department, develop using Agile cycles, and then deliver functional groups sequentially. For sensitive business processes, the business might add requirements for traceability and acceptance testing in stages.

For example, consider a project with 10 functionalities, 6 of which have clearly defined rules and 4 that still require user testing. The project team can build prototypes using RAD for the 4 undefined functionalities, while using the Waterfall or V-Model approach for the 6 already defined functionalities.

4. Why is RAD suitable for many enterprise software projects?

4.1. Verify the need before investing fully.

A prototype helps the client and the development team agree on the earliest possible value proposition. For an outsourcing company (ITO), a prototype test can help clarify the scope and delivery criteria before estimating the effort required for the rest of the project.

4.2. Detecting Exceptions in the Actual Process

The process described in the documentation often outlines common scenarios. During hands-on testing, users may encounter exceptions such as approving documents in the absence of a manager, changing approval levels based on transaction value, or returning documents for further information. Clarifying these situations early helps limit the need for multiple simultaneous functional modifications during the implementation phase. In practice, exceptions like approving documents only become apparent when users process a sample set of documents from start to finish, rarely appearing during process description meetings.

4.3. Reusing components to focus on business processes.

A low-code platform allows teams to build forms, data models, and processes from pre-existing components. Developers can then dedicate more time to specific logic such as limits, permissions, reconciliation, and integration. When transitioning the prototype to a working application, the team still needs to test data, permissions, performance, and exception handling.

5. How does the 1C:Enterprise platform support rapid application development?

5.1. Low-code platform for enterprise management applications

1C:Enterprise is a low-code technology platform that combines programming with 1C Script to build and customize enterprise management applications. On this platform, development teams can build applications for sales management, production, inventory, finance and accounting, or industry-specific processes. According to the Vietnam Internet Association, more than 1.5 million businesses worldwide use solutions built on this platform.

>>> Read more: 1C:Enterprise - a technology platform that helps build specialized software for businesses

5.2. From Prototype to Deployable Application

  • Business processes are modeled using metadata. The development team configures objects such as catalogs, documents, logs, and business processes . The platform uses metadata to interpret data structures and support form creation. For example, in a purchasing process, the catalog stores information about materials and suppliers, the document records the purchase request, and the business process identifies the person responsible for each step.
  • Combining configuration and 1C Script. The team can use the visual tools in Designer to define objects and build test forms, then write additional 1C Script for specific rules such as departmental quotas or data validation during integration. Development and debugging tools help the team test changes before deploying to the operational environment.
  • Deployment is based on the usage environment. Depending on the application design and infrastructure, users can work on desktops, web, or mobile devices. Businesses can choose on-premises or cloud infrastructure according to their operational needs.
  • Separate customizations using extensions. When adjustments to a standard application are needed for a client, the development team can place the appropriate customizations within an extension . This allows for better change management and makes compatibility testing with updates more convenient.

5.3. Value to the ITO company and the software development team

The project team can use a prototype to validate requirements before finalizing the scope, then retain the appropriate components for the operational version. For an ITO company with many clients in the same industry, shared functionalities such as catalogs, approval flows, and reports can be standardized for reuse . Client-specific elements are handled according to their own data, policies, and processes, paving the way for industry-specific solution packaging. Businesses can start with a business flow, such as a purchase request, and then evaluate prototyping time, business responsiveness, and integration effort before expanding to other modules.

LEARN MORE ABOUT THE 1C:ENTERPRISE PLATFORM HERE.

6. Conclusion

Choose a software development model based on what the project needs to control first. Waterfall is suitable when scope is stable, V-Model when test proofs are needed, and Spiral when technical risks determine the next investment step. Agile and Iterative are suitable when learning from feedback is needed, Incremental when functional team delivery is possible, and RAD when rapid business process validation using prototypes is required.

If the project has multiple user groups and requirements are constantly changing, choose a process with clear value proposition to test first. The results from this test will help the project team finalize the scope, testing methods, and the order in which to deploy subsequent parts.

Source:

  • NASA Software Engineering Handbook - SWE-019 Software Life Cycle
  • Agile Manifesto - Principles behind the Agile Manifesto
  • IBM - Rapid application development
  • NASA Technical Reports Server (NTRS) - V-Model document, code 20200012040
  • Software Engineering Institute, Carnegie Mellon University - report on the Spiral model
  • Spotify Engineering - How we improved developer productivity for our DevOps teams
  • 1C:Enterprise Development Network (1C:DN) - documentation on configuration objects, Designer, and extensions.
  • Vietnam Internet Association - data on businesses using solutions on the 1C:Enterprise platform.

Deploy a digital transformation solution for your business today