Kiến thức quản trị
Home Products news What is SDLC? 7 phases and how to shorten the software development lifecycle.
Phạm Viết Quý - Chuyên gia đào tạo nền tảng tại 1C Việt Nam
(26.11.2026)

What is SDLC? 7 phases and how to shorten the software development lifecycle.

Time to market is becoming an increasingly important competitive factor for software and IT outsourcing companies. However, shortening development time is not simply a matter of requiring developers to write code faster, as businesses need to optimize the entire lifecycle, from requirements analysis, design, programming, testing to deployment and maintenance.

The Software Development Lifecycle Framework (SDLC) provides a systematic management framework that helps teams control quality, cost, schedule, and risk throughout the software development lifecycle. This article will explain what the SDLC is and its various phases, common challenges that prolong the software development lifecycle, and methods and technology platforms that can shorten the SDLC without compromising quality.

Quick summary

  • The Software Development Life Cycle (SDLC) is a framework for managing the entire software lifecycle, typically consisting of seven phases from planning to operation and maintenance.
  • Shortening the SDLC requires addressing requirements, testing, deployment, architecture, and technology concurrently, not just requiring developers to write code faster.
  • Lead time for changes, deployment frequency, change failure rate, and failure recovery time are metrics used to measure the effectiveness of SDLC.
  • For enterprise management applications, the 1C:Enterprise platform helps reduce engineering workload through metadata, pre-built Business Components, and low-code integration with 1C Script.

1. What is SDLC? Why do businesses need to manage the software development lifecycle?

1.1. Definition

SDLC stands for Software Development Life Cycle.

This is a process framework that describes the entire journey of a software product , from need identification, planning, development, testing, deployment, to maintenance or decommissioning.

According to the NIST glossary (SP 800-218), SDLC is a formal or informal methodology for “designing, creating, and maintaining software” .

SDLC helps organizations clearly identify:

  • Tasks to be performed in each stage
  • Roles and responsibilities of the participating parties
  • Input and output of each stage
  • Standards for evaluating product quality
  • How to control project progress, budget, and risks.

1.2. How does SDLC differ from software development processes and models?

Concept Meaning
SDLC The entire software lifecycle, from concept to operation and maintenance.
Software development process Specific activities and steps in the lifecycle.
Software development model Methods for organizing and structuring SDLC phases, for example, Waterfall, Agile, Spiral, or V-Model.
Development method Principles, techniques, and work collaboration methods such as Scrum, Kanban, DevOps, or RAD.

Note: SDLC should not be equated with Agile. Agile is a way of organizing and executing activities in SDLC in an iterative, flexible manner, and the same software development lifecycle can be implemented in many different models.

1.3. Why do businesses need to manage the software development lifecycle?

From our experience deploying enterprise management applications, we've found that most projects are delayed not because of slow programming, but because the requirements weren't clearly defined in the early weeks.

Project scope and requirements control : SDLC helps clearly define what problems the software needs to solve, what functions it should have, and what acceptance criteria it should meet, thus reducing scope creep.

Transparency in progress and costs : Each phase has specific goals, resources, outputs, and deadlines, making it easier for businesses to budget and track actual progress.

Software quality improvement : Inspection, evaluation, and testing activities are integrated into the process instead of being performed only after programming is complete.

Reducing the risk and cost of bug fixes : The later a requirements or design error is discovered, the greater the cost of correction. SDLC helps to check and address risks earlier. For example: a hypothetical order management application project is expected to last 20 weeks. If an order approval request is misinterpreted and only discovered in week 14, the team must redesign, reprogram, and retest the relevant part, potentially taking an additional 3-4 weeks. If the requirement is validated with a prototype from week 3, corrections typically only take a few days.

Enhanced collaboration among stakeholders : SDLC creates a common language and workflow between clients, business analysts, developers, testers, DevOps, and operations teams.

Long-term maintenance and expansion support : Software does not end its lifecycle after release. The system still needs updates, bug fixes, feature expansions, and adaptations to new business requirements.

2. 7 basic stages in the software development lifecycle

Note that the number and names of the stages may vary depending on the organization or development model. However, a typical SDLC usually includes the following seven stages.

2.1. Planning

Main responsibilities:

  • Identify the problem and business objectives.
  • Defining the project scope
  • Assess technical, financial, and operational feasibility.
  • Estimate resources, budget, and timeline.
  • Identify initial risks.

Expected output:

  • Project charter
  • Project plan
  • Budget and resource estimates
  • Preliminary risk list

2.2. Requirements Gathering and Analysis

Main responsibilities:

  • Interviewing customers and users
  • Analyze the current business process.
  • Identify functional and non-functional requirements.
  • Prioritize the requests.
  • Establish acceptance criteria

Expected output:

  • Software requirements specification document
  • User story or use case
  • Business process model
  • Acceptance criteria

Note: This is often one of the most impactful phases in terms of project time and cost, as unclear requirements can easily lead to multiple revisions in later stages. A common mistake at this stage is simply recording user input without asking about exceptions, such as order cancellations, returns, or price changes after approval. These situations often only become apparent during acceptance testing (UAT), when rework has already taken considerable effort.

2.3. System Design

Main responsibilities:

  • Software architecture design
  • Database design
  • Modular design and integration flow
  • User interface and user experience design
  • Define security, performance, and scalability standards.

Expected output:

  • System architecture documentation
  • Data model
  • API specification
  • Wireframe or prototype
  • Detailed design of each module

2.4. Software Development

Main responsibilities:

  • Build the database, backend, frontend, and API.
  • Write business logic
  • Integrating modules
  • Perform code review
  • Source code version management
  • Write unit tests and technical documentation.

This is often the most resource-intensive phase, especially when the team has to manually build many repetitive technical components.

2.5. Testing

Testing methods may include:

  • Unit testing
  • Integration testing
  • System testing
  • Performance
  • Security
  • User Acceptance Testing
  • Regression testing

Target:

  • Verify that the software is working correctly as required.
  • Detect errors before deployment.
  • Performance, stability, and security assessment
  • Minimize regression errors after each update.

2.6. Deployment

Main responsibilities:

  • Prepare the operating environment.
  • Data transformation and cleaning
  • Install or release the system
  • User training
  • Monitor the system after going live.
  • Develop a rollback plan in case of failure.

The following options are possible for implementation:

  • Big Bang
  • Modular divergence
  • Pilot
  • Blue-green deployment
  • Canary release

2.7. Operations and Maintenance

Main responsibilities:

  • Monitor performance and stability.
  • Fix the errors that occurred.
  • Patch security vulnerabilities
  • Feature update
  • Adapt the software to business changes.
  • Upgrading infrastructure and technology
  • Technical debt management

Note: With enterprise software, maintenance is often the longest phase in the entire lifecycle.

3. Common SDLC models

Model Characteristic Adaptability Fit
Waterfall Sequential Short Stability requirements
V-Model Step-by-step corresponding testing Short The system needs strict control.
Iterative/Incremental Iterated and piecemeal development High The product is modular.
Agile Short cycle, continuous feedback Very high Requirements change frequently.
Spiral Iterative and focused risk management High Large project, high risk.
DevOps Continuously from development to operations High The product needs to be released regularly.

3.1. Waterfall

The Waterfall model executes phases sequentially, completing the previous step before moving on to the next. This model is suitable when requirements are clear and change infrequently, but it is difficult to adapt if the client adjusts requirements after the project has progressed to the development phase.

3.2. V-Model

In the V-Model, each design phase has a corresponding testing activity. This model is suitable for systems requiring a high level of control and verification, but is less flexible when the scope frequently changes.

3.3. Iterative and Incremental

The software is built and refined through multiple iterations, allowing for the delivery of functional components in stages. This enables the team to gather feedback early and reduces the risk of building a flawed product.

3.4. Agile

Agile divides projects into short cycles, continuously receiving feedback and adjusting priorities. This model is suitable for projects with rapidly changing requirements, but which demand frequent customer involvement and a well-coordinated team.

3.5. Spiral

Spiral combines iterative development with risk analysis at each stage. This model is suitable for large, complex projects or those using new technologies, but requires a high level of risk management capability.

3.6. DevOps

DevOps connects development, testing, deployment, and operations, while enhancing automation and continuous feedback. This approach shortens the gap between code completion and feature deployment.

>>> Read more: Top 7 popular software development models today

4. Indicators for evaluating the effectiveness of SDLC

To determine if optimization truly helps shorten the software development lifecycle, businesses should monitor the following metrics:

  • Lead time for changes: The time from when a request is made until it is put into operation.
  • Cycle time: The actual time a team spends working on a task.
  • Deployment frequency: The frequency of new version deployments
  • Change failure rate: The percentage of deployments that fail or require a rollback.
  • Mean Time to Recovery: The average time to recover from an incident.
  • Defect escape rate: The rate at which defects are only discovered after release.
  • Rework rate: The percentage of tasks that need to be reworked.
  • Time to prototype: Time to create a prototype.
  • Requirement volatility: The degree of change required in the project.
  • Technical debt ratio: The proportion of resources allocated to addressing technical debt.

Note: Don't just measure the number of lines of code or coding speed. The ultimate goal is to shorten the time to deliver business value while maintaining quality, security, and maintainability.

In the list above, lead time for changes, deployment frequency, change failure rate, and failure recovery time are all part of the software delivery performance metrics published by the DORA team.

5. Challenges that prolong SDLC

5.1. Requirements are unclear or constantly changing.

The parties involved haven't agreed on objectives, the requirements document lacks acceptance criteria, and users often only realize their real needs after viewing the product. In such cases, scope creep leads to the addition of many unplanned features, prolonging the project timeline.

5.2. Disjointed communication between business and technical teams

Business analysts, developers, testers, and clients often use different terminology, and feedback has to pass through many intermediate layers. Therefore, a developer may understand the technical requirements correctly but not the business problem.

5.3. Many common components need to be rebuilt.

Enterprise application projects often repeat many components such as:

  • Category
  • Document
  • Approval process
  • Delegation of authority
  • Report
  • Input interface
  • Database structure
  • Change log

Redeveloping these foundational components increases coding time but does not directly create a business difference for the product.

5.4. Testing was performed too late.

Many teams only begin testing when most of the functionality is complete, so design flaws are often only discovered after many modules have become dependent on each other. A lack of test automation also makes regression testing time-consuming with each update.

5.5. Integrating multiple complex systems

Each system uses different data structures and protocols, while there is no unified API standard. Data synchronization therefore relies on manual tasks, and changes in one system can have a ripple effect on other systems.

5.6. Accumulated Technical Debt

The lack of standardized code, outdated technical documentation, and direct customization of the core make the old architecture difficult to scale or upgrade. As a result, teams spend more time fixing bugs instead of developing new value.

5.7. Manual deployment and operation procedures

Build, test, and release rely on human intervention, while the development, testing, and production environments lack consistency. When bugs are released, it's difficult for the team to roll back, and approval and handover times between teams are extended.

6. How to shorten the software development lifecycle without sacrificing quality.

6.1. Standardize and prioritize requirements from the outset.

Businesses should clearly define the business outcome instead of just listing features, and categorize requirements as Must-have, Should-have, Could-have, and Won't-have. Building a prototype helps verify requirements early, while acceptance criteria should be agreed upon before development, and all requirements should be maintained in a unified information source.

6.2. Break down the product for release in parts.

Instead of releasing the entire product at once, the team can start with an MVP or Minimum Marketable Feature and break the system down into independent modules. The function that creates the highest business value should be prioritized first, allowing the team to gather feedback before investing in the full scope.

6.3. Shift testing and security activities to an earlier stage.

Instead of waiting until the end of the project to run security tests and reviews simultaneously, the team can place quality activities earlier in the project. This is the concept of Shift Left, which involves reviewing requirements and architecture from the outset, writing unit tests in parallel with development, and integrating security testing into the pipeline. As a result, vulnerabilities are detected before they spread to multiple modules.

6.4. Applying CI/CD and automation

CI/CD and automation help reduce the waiting time between development, testing, and operations. Steps such as building, running tests, quality checking, packaging, and deploying can all be automated, and the environment is standardized using Infrastructure as Code.

6.5. Reusing architecture, modules, and common components

The team should build a design system, standardize shared libraries, use APIs and integration templates, and leverage proven components, frameworks, and business logic. This approach helps avoid redeveloping common functionalities from scratch.

6.6. Building a multi-functional team

Bringing the product owner, business analyst, developer, tester, and DevOps team into a unified workflow reduces the number of departmental handovers. When project teams are empowered to make decisions and have shorter feedback loops with the customer, the waiting time between steps is also significantly reduced.

6.7. Use a low-code platform suitable for the problem.

Low-code doesn't completely replace developers. The main value lies in automating or configuring common technical aspects, allowing the team to dedicate more time to complex business logic.

Benefits can include reduced manual coding, increased reusability, faster prototyping, and standardized application architecture. Low-code platforms also shorten requirements tuning time, minimize discrepancies between the database, interface, and business logic, and support easier maintenance and scaling.

However, not all low-code platforms are suitable for all types of software. Businesses need to evaluate code customization capabilities, integration, performance, security, scalability, and vendor dependency. For complex business applications, platforms that combine low-code with scripting or in-depth programming should be prioritized.

7. About 1C:Enterprise - A platform that helps shorten the SDLC of enterprise management applications.

Methods like Agile, DevOps, and CI/CD optimize project organization and operation. However, development time still heavily depends on the volume of technical work developers have to perform. For enterprise management applications, using a platform with readily available business components and unified development tools can further shorten the design-to-maintenance lifecycle.

7.1. Overview of the 1C:Enterprise platform

1C:Enterprise is a platform for developing and operating applications that automate business management processes. This platform is developed by 1C Company, a leading technology group in Eastern Europe with over 1.5 million users in more than 95 countries worldwide and over 5,000 businesses in Vietnam.

The 1C:Enterprise ecosystem consists of two components. The platform provides the execution environment, development tools, deployment, administration, and maintenance of applications, while Applied Solutions are application solutions built and operated on the platform's technology. 1C:Enterprise can be used to build:

  • ERP
  • printer
  • Finance - Accounting
  • HRM
  • Warehouse and Trade Management
  • Document and process management
  • Internal business applications
  • Specialized management solutions

>>> See also: A comprehensive enterprise management solution ecosystem has been implemented in Vietnam .

The 1C:Enterprise platform provides a Rapid Application Development (RAD) environment for developing business process automation applications. This approach is well-suited for enterprise software because applications often have many similar business objects and processes that need frequent adjustments to meet customer requirements. The system needs to deploy quickly, be highly customizable, and require long-term maintenance and expansion. Note that 1C:Enterprise does not replace the SDLC but only helps reduce the engineering workload in certain stages of the software development lifecycle.

7.2. Mechanisms that help 1C:Enterprise accelerate application development

Criteria Traditional development Developed on 1C:Enterprise
Data structures Custom design and programming Description via metadata
Operational components Build your own or integrate Business Components are available.
Interface Develop separately Supported by a birth and management platform.
Business logic Mainly written in code. Combining configuration and 1C Script
Developer focus Technical and operational infrastructure Focus more on the job.

In traditional development, developers often have to build many separate engineering layers such as:

  • Classes and data models
  • Database structure
  • Input interface
  • Query and report
  • Delegation of authority
  • Processing procedure
  • Operating mechanism in each environment

The 1C:Enterprise platform helps alleviate this workload through three main mechanisms:

Mechanism 1: Metadata-driven architecture:

Developers describe the structure and behavior of an application through metadata. The platform uses metadata to manage data-related components, user interface, and application behavior. The value lies in reducing manual coding in common components and minimizing discrepancies between the database, interface, and logic. The platform also helps accelerate change as business requirements adjust and standardizes application structure across projects.

Mechanism 2: Pre-built Business Components:

1C:Enterprise provides various types of business components such as:

  • Catalog
  • Document
  • Accumulation Register
  • Accounting Register
  • Calculation Register
  • Business Process

Developers can use these components as application building blocks. For example, Catalog is used to manage customers, products, or employees, while Document represents sales orders, purchase orders, or warehouse receipts. Register stores balances, changes, or accounting data, and Business Process supports building approval and workflow processes.

Mechanism 3: Combining low-code with 1C Script

The development team can combine object property configuration, object relationship design, and visualization tools with writing business logic using 1C Script, while integrating with external systems. This creates a balance between the speed of low-code development, the customization capabilities of traditional programming, and the in-depth requirements of enterprise applications. Developers can therefore focus more on modeling business processes, building their own business logic, and addressing industry-specific requirements. This also allows for early prototyping and the development of a unique product value proposition.

7.3. How does 1C:Enterprise support SDLC phases?

In the initial phase, the primary value lies in facilitating early prototyping and requirements verification. During the design and development phases, the platform reduces repetitive engineering tasks, while in the deployment phase, it provides a unified operating environment. In the maintenance phase, extensions help mitigate conflicts between standard and custom components.

Extensions allow for the expansion of logic without directly modifying the core in many cases, while also supporting the separation of standard and custom components. This makes version upgrades more convenient, reduces the risk of technical debt from direct customization of the original system, and makes it easier to maintain separate versions for each customer.

SDLC phase Method 1C:Enterprise supports
Planning and requirements analysis Create prototypes early, model requirements using business objects.
Design Use metadata and Business Components instead of designing the entire structure from scratch.
Develop Combining low-code, pre-built components, and 1C Script
Testing A unified application architecture helps reduce discrepancies between data, interface, and logic.
Deployment Support for application operation on desktop, web, and mobile; deployment on-premise or cloud.
Maintenance and upgrades Extensions help separate the standard and custom parts, limiting direct modifications to the core.

7.4. When should businesses use 1C:Enterprise?

1C:Enterprise is suitable for:

  • ITO company wants to shorten the time it takes to build management applications for its customers.
  • A software company wants to develop ERP, CRM, HRM, workflow, or SaaS.
  • The team wants to reuse the platform and business logic for multiple projects.
  • Businesses need a customized management system tailored to their specific processes.
  • The product needs to be continuously expanded and upgraded.
  • The unit wants to dedicate more resources to business logic rather than building application infrastructure from scratch.

A large-scale example: Russian Post implemented an electronic document management system built on the 1C:Enterprise platform, serving 36,000 employees across the Russian Federation. Furthermore, according to assessments on G2 , the average deployment time for 1C:Enterprise is approximately 4 months, and the average payback period is approximately 16 months.

Conversely, businesses need to consider carefully when the project doesn't fall under the category of management or business automation applications, or when the product requires specialized graphics technology, game engines, or processing outside the platform's scope. Without a plan to train the team and build development capabilities within the 1C ecosystem, implementation will likely not achieve the expected results.

Based on our implementation experience, we often recommend that teams start with a small module consisting of a catalog, a document, and a report before deciding to build the entire product on the platform. This approach allows the team to see early on how long it takes to familiarize themselves with the 1C environment and which parts of the product can leverage pre-built components.

>>> Read more: Guide to downloading and experiencing the 1C:Enterprise platform

Conclude

The Software Lifecycle Framework (SDLC) is not just about writing code; it encompasses the entire software lifecycle, from concept to maintenance. To shorten the SDLC, businesses need to simultaneously address bottlenecks in requirements, team coordination, testing, deployment, architecture, and technology. Agile, DevOps, and CI/CD optimize workflow organization, while low-code, metadata-driven, and RAD directly reduce engineering workload. For enterprise management applications, 1C:Enterprise provides a rapid development environment, pre-built business components, and the ability to combine configuration with scripting, allowing developers to focus more on business logic and the unique value proposition of the product.

References: NIST (Secure Software Development Framework), DORA (Accelerate State of DevOps), Russian Post, G2 (1C:Enterprise review).

Deploy a digital transformation solution for your business today