Trần Quốc Hùng - Chuyên gia cao cấp tư vấn triển khai các giải pháp ERP và Văn phòng số tại 1C Việt Nam
(28.11.2026)

What is TCO? How to calculate the total cost of ownership when investing in ERP?

When comparing two ERP quotes, a business might find one option requires less capital to launch. However, once the system is operational, subscription fees, maintenance, upgrades, and expansion can change the order. If the business plans to open additional factories or warehouses in the next few years, the difference will also depend on how the vendor charges for expansion. That's why the finance department and project team need to calculate the total cost of ownership, or TCO , before finalizing an option.

TCO is the total cost a business expects to incur over the lifetime of an asset or system. With ERP, create a cost breakdown by year, covering everything from license purchase and implementation to operation, upgrades, and expansion. By calculating costs across different options within the same scope and over the same period, businesses can compare both the total budget and the amount needed each year.

Quick summary

  • TCO is the total projected cost over the lifetime of an ERP system, including both the initial investment and the costs of operation, upgrades, and expansion.
  • Five cost categories should be included in the table: licenses or subscriptions; surveys, deployment, and customization; data, integration, and training; infrastructure, operations, and support; upgrades, expansion, and end-of-use.
  • Calculation method: finalize the scope and evaluation period, break down the price quotation by year, and then test scenarios that might change the order of the options.
  • For example, a 5-year scenario: a subscription option requires less capital before operation but may have higher overall costs than a license purchase option.
  • Medium and large manufacturing businesses can include 1C:ERP in their TCO table for comparison with other options.

1. What is TCO?

TCO stands for Total Cost of Ownership. According to IBM , this metric encompasses both direct and indirect costs throughout the lifecycle of a product or service. For ERP software, direct costs might include licenses, implementation fees, and infrastructure. Indirect costs could include the time and effort required for data standardization, testing, and learning new processes.

In a manufacturing ERP project, the finance department may receive software and implementation service quotes upfront. Simultaneously, the warehouse must reconcile inventory balances by batch, the production department must standardize production quotas, and the IT team needs to check integration with existing systems. These tasks consume internal staff time. By allocating the corresponding hours and costs, the business can achieve a more accurate budget.

TCO also helps determine the cost component that needs to be included in the ROI calculation. TCO tells you how much a business has to spend during the evaluation period. ROI considers the value gained from that investment. For example, data standardization fees are an expense, while the value from reduced inventory reconciliation time is a benefit that needs to be measured separately.

>>> Read more: ROI when implementing ERP: how to evaluate the effectiveness of digital transformation investment for manufacturing businesses

2. What are the total costs of owning an ERP system?

2.1. Software License or Subscription

When reviewing ERP software pricing, determine whether the vendor charges per user, concurrent users, modules, or operating unit . For license-based models, clarify the scope of usage rights and any potential fees for adding users or modules. For subscription models, check the billing period, renewal terms, and items included in the recurring fee.

2.2. Survey, Implementation, and Customization

ERP implementation costs typically include surveying, process design, configuration, testing, and support for system deployment. If the solution requires custom development to meet specific requirements, factor in additional effort for building and retesting upon upgrade. In the quotation, request a breakdown of available features, configuration, and additional development needed to understand which costs may vary depending on the project scope.

>>> Read more: ERP implementation costs: how much should businesses invest?

2.3. Data, Integration, and Training

Data transfer includes tasks such as standardizing material codes, handling duplicate records, and reconciling opening balances. Integration may involve electronic invoicing, banking, production management systems, or inventory software. For training, budget for both instruction sessions and personnel time for practice and testing. An existing connection still needs to be tested on the company's real data and processes.

2.4. Infrastructure, operation and support

For on-premise ERP , the budget may include servers, databases, backups, security, and administrative personnel. For cloud-based ERP , determine who will bear the costs of storage, testing environment, backup, and recovery. In both models, clarify the scope of support after the system goes live, response times, and how fees will be charged for off-contract requests .

2.5. Upgrades, expansions, and decommissioning

Expanding to a new plant can entail costs for permits, process configuration, training, and data migration to the new location. A major upgrade may also require retesting of custom integrations or features. If the review includes system replacement, budget for data export and migration costs. Items already included in the maintenance package should only be recorded once.

3. How to calculate ERP TCO to compare investment options

3.1. Step 1. Finalize the scope of operations and the evaluation period.

Start by numbering the required legal entities, factories, warehouses, users, and business groups. For example, a business needs to plan production, track raw materials by batch, and aggregate costs by production order at two factories. If a third factory is planned for the fourth year, apply the same assumptions to all scenarios and record the year the expense is incurred .

3.2. Step 2. Break down the quotation and allocate costs to each year.

Place license purchases, data migration, and deployments into the projected billing period. Then allocate maintenance, subscriptions, infrastructure, upgrades, and expansions to the corresponding years. For internal costs, you can multiply the estimated hours of each personnel group by the hourly cost. Mark lines without quotes for easy updating once the vendor confirms.

Total Cost of Ownership (TCO) for the period = Initial investment cost + Operating costs during the period + Change and expansion costs during the period + End-of-use costs, if incurred during the period.

To avoid duplication, standardize the cost groups for each line item. For example, if the subscription fee already includes infrastructure and backup, the TCO only needs to record the subscription and any additional services. When two options have significantly different billing schedules, the finance department can add the present value of the line item at the same discount rate.

3.3. Step 3. Check assumptions that may change the results

Create a scenario based on the current plan and a faster scaling scenario. Variables worth exploring include the number of users, the timing of factory opening, the increase in renewal fees, and the customization effort required. If a small change reverses the order of the two options, prioritize confirming the relevant terms before signing the contract . For example, ask the provider to specify the fees for adding a new user group or adding a new warehouse.

4. Example of calculating the total cost of ownership of an ERP system over 5 years.

Suppose a manufacturing business is comparing two options with the same business scope and expansion plan. Option A uses a subscription model. Option B purchases an initial license. The table below uses hypothetical figures, in millions of VND, with five years of operation after deployment and without discounted cash flows. The initial integration cost of Option B is included in the deployment package.

Category Option A Option B
Initial license
0
780
Deployment, configuration, and customization
900
980
Data transfer and pre-operation training
200
260
Initial integration outside of the deployment package.
300
0
Subscriptions, infrastructure, and support for 5 years.
1,075
550
Upgrade and retest during the period.
300
150
Expand the scope during the period.
225
180
Total cost of ownership over 5 years
3,000
2,900

Option A requires 1,400 million VND upfront, while Option B requires 2,020 million VND. After five years, Option B has a total cost that is 100 million VND lower due to lower operating and expansion costs in the hypothetical scenario. If the support or upgrade costs for Option B increase by more than 100 million VND during the period, the results will reverse, assuming other costs remain constant.

From this table, management can simultaneously view two figures: the capital required before operation and the total budget for the entire period. If the business needs to spread out cash flow, request a payment schedule with milestones and include each installment in the table. The same TCO level can create different cash flow pressures depending on the year requiring additional investment.

5. How does 1C:ERP optimize total cost of ownership?

1C:ERP is a comprehensive enterprise resource management (ERP) solution for medium and large enterprises, including corporations. The solution is developed by 1C Company, a leading Eastern European technology group with over 1.5 million users in more than 95 countries worldwide.

For medium and large manufacturing businesses, the ability to handle cross-departmental operations directly impacts deployment costs and system maintenance effort. Two key factors to consider when evaluating 1C:ERP are the licensing mechanism and the extent to which standard features are met.

5.1. Software license fees are charged once.

According to the 1C:ERP product information, software licenses are charged as a one-time fee . When preparing the Total Cost of Goods (TCO), businesses can include this in the initial investment cost within the quoted price range. Deployment, infrastructure, support, upgrade, and expansion costs still need to be budgeted according to applicable terms. If there are plans to increase users or add plants, request a separate price for expansions to accurately budget for each year.

5.2. Standard features reduce the need for customization.

1C:ERP supports business processes such as production planning, inventory management, and financial management on a single system. When a company's processes align with the standard features, the project team can reduce the amount of individual development and the number of items requiring retesting during an upgrade. This difference should be quantified from the actual requirements list.

For example, a plastics manufacturing business might require a demo covering everything from sales orders to production planning, material procurement, finished product procurement, and cost calculation. At each step, confirm which functionalities are available, which need configuration, and which require further development . This list helps the business verify the work included in the quotation and anticipate potential additional costs.

5.3. Comparing the optimal TCO level across the company's project scope.

Based on a survey of over 500 businesses using 1C:ERP, 1C Vietnam recorded a total cost of ownership optimized by up to 30% . To estimate the optimal level for a specific project, businesses should compare quotes for the same number of users, locations, business scope, and evaluation period. When demoing, prioritize processes that have the potential to increase budget, such as managing production across multiple factories or integrating with existing systems.

One example is TONMAT Group , a client of 1C Vietnam, which is applying 1C:ERP to 18 factories, branches, and operational units. The system helps update business data in real time and track orders centrally. Mr. Nguyen Duc Long, representative of the Digital Transformation Department of Tonmat Group, commented on the ability to implement the software after two months of training: "This demonstrates the flexibility of the 1C:ERP solution, ready to meet all our business needs."

REGISTER FOR A CONSULTATION & RECEIVE A 1C:ERP DEMO HERE.

1C:ERP

6. Frequently Asked Questions about the Total Cost of ERP Ownership

6.1. How do TCO and ERP implementation costs differ?

ERP implementation costs typically focus on the work required to get the system up and running. Total Cost of Goods of Service (TCO) includes implementation costs and incidental expenses during the evaluation period, such as licenses or subscriptions, operation, maintenance, upgrades, and expansions. The pricing ranges of each vendor can vary, so compare each line item before including it in your spreadsheet.

6.2. How many years should the Total Cost of Ownership (TCO) of an ERP system be calculated over?

A five-year timeframe can be used if it aligns with budget and expansion plans. Businesses with three-year subscription contracts or those planning to replace their system after a longer period may choose a different timeframe. The key is to use the same timeframe for all options and include large expenditures such as renewals, upgrades, or expansions in the schedule.

6.3. What should I ask when receiving a quote for ERP software?

Ask the vendor to clearly state the scope of business, number of users, systems to be integrated, and each party's responsibilities during the data migration. Request that they specify unit prices or pricing principles for items that are subject to change, such as adding locations, upgrading versions, or adding integrations. If the quote includes an estimated cost, clearly state the assumptions behind that figure and the timeframe for finalizing the estimate.

6.4. Does Cloud ERP have a lower TCO than on-premise ERP?

The outcome depends on the configuration and operating method. With cloud computing, factor in subscriptions, storage, backups, and separate paid services. With on-premise computing, factor in servers, redundant infrastructure, security, and IT resources. Compare the two models with the same performance, data recovery, and support requirements to make an informed decision.

A TCO (Total Cost of Goods) table is valuable when each figure is accompanied by a clear assumption about the scope, timing, and terms of the contract. Businesses should use this table from the initial survey stage to check quotes, then update it with demo results and discuss it with the supplier before finalizing the budget.

References: IBM, article "What is Total Cost of Ownership?"; Dan Tri Newspaper, article "1C Vietnam implements comprehensive digital transformation for Tonmat Group"; 1C Vietnam, survey results of over 500 businesses using 1C:ERP; 1C Vietnam, information on the 1C:ERP product.