WBS helps businesses easily divide work into smaller tasks, creating a clear and detailed structure for the project. To better understand what a WBS is and the benefits as well as how to create an effective WBS, let's learn with 1C Vietnam through the article below.
WBS (Work breakdown structure) is a concept used to describe the process of systematically decomposing and dividing a project into sub-tasks or smaller work packages. The purpose of the WBS is to create convenience and ease in deploying and controlling work. Small jobs must be within the scope and solve the goals of the big job, and can be independent or have a dependent relationship with each other. A large task is considered complete when all sub-tasks have been completed.
The WBS is often represented as a hierarchical tree, where each level represents the level of detail of the work. The overall project is at the highest level, then broken down into multiple work packages and finally the most detailed tasks that can be assigned to an individual or team.
Work Breakdown Structure (WBS) plays an important role in project management. Some key benefits of a WBS include:
After businesses have understood what WBS is and its benefits, below are some illustrative examples of complete work breakdown structure diagrams:
WBS in building construction project
WBS in market research project
WBS in software development projects
Through some examples of WBS structures, the first part of the WBS is often the project goal or the final product to be completed. Immediately following are the levels representing the main work required to carry out the project. Typically, the WBS will include 5 phases: Initiation, planning, implementation, control and project closure.
In project management, building a WBS means dividing tasks into work packages based on the goals of each phase. Each work package can be considered as a sub-project within the larger project. For example, during the initiation phase of a construction project, some of the tasks that need to be performed include site surveys and creating a project charter.
Project managers can also further break down each work package into lower-level tasks. For example, a work package to set up an interior system can be divided into many subtasks such as installing plumbing systems, installing electrical systems.
WBS offers many benefits in project setup and management. To build an effective WBS, businesses can refer to the following steps:
Before creating the WBS, the initial work is still one large block. Therefore, managers need to decompose and identify small tasks from the beginning. This step is only completed when there is information about the time required for each task in the current work block.
The next step is to build an implementation plan for each appropriate job. Businesses need to recognize the influence and dependencies between tasks because even a small delay can cause the entire project to be delayed.
Forming the work structure is the final step in the process of building a complete WBS. Businesses will classify jobs at the same level and continue to arrange smaller jobs. This way, members will understand the order and avoid missing any work in the project.
Depending on the purpose of dividing work in the project, businesses can choose to organize by delivery capacity or by phase.
This way, businesses can divide work into many main parts. The business is then further divided into smaller delivery points, work packages, and subtasks.
Enterprises will break down the first level into 5 main stages in the project life cycle including initiating, planning, implementing, controlling and closing the project. Each phase is then further divided into work packages similar to a WBS based on deliverables.
When building a WBS, businesses need to pay attention to the following 4 important principles:
The work breakdown structure (WBS) is applied to many different situations including:
When WBS is combined with project management software, decomposing and controlling work becomes much easier. For example, when a task in a project changes time, related and dependent tasks will automatically change as well. The software system will immediately notify the person in charge to easily monitor and perform the work.
Besides building a WBS, businesses can apply project management software to improve management efficiency. Developed on a modern technology platform, 1C:Document Management Digital Office solution allows businesses to automate project management simpler, faster and more effectively. Software is a powerful tool that helps businesses reduce operating costs, eliminate redundant work in the work process, save time and management human resources, thereby minimizing potential risks and bringing benefits to businesses. success for the project implementation.
The solution has all the features to support effective management of work within the required project framework:
Above, 1C Vietnam has informed businesses about what WBS is , the benefits as well as how to create an effective WBS. Hopefully the above information will help businesses gain more knowledge about WBS and find appropriate management solutions. In addition, for support in implementing project management software, please contact 1C Vietnam today.